Systems
S2 Systems
Preconditioning options include scragging and load set. (Above) You can scrag your spring based on a number of cycles or based on a time duration. (Below) Your spring may be set solid as a preconditioning prior to your actual test procedure. For example, compress to 12 lbf and hold for 1 minute.
Create compression and extension tests using the test templates supplied as standard with your S2 system. Or, use the optional Test Builder application to create sophisticated, multi-point test setups for more advanced spring measurement. The optional S2 Automation Builder software works with the S2 Test Builder application so you can use conditional branching and digital I/O to interface with ancillary equipment such as annunciators, conveyors and turret loading devices.
The Pre Test step lets you specify test attributes before you actually begin your testing. Set units of measure, pre-conditioning, user prompts and datum criterion.
During your test, status messages display providing the operator with immediate feedback on the active step and the step's performance characteristics and current measurement. An LED on the Start/Stop push button on your test frame also indicates an active test condition.
24
Powered by FlippingBook